Activity Floats

video-placeholder
Loading...
View Syllabus

Skills You'll Learn

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Reviews

4.8 (1,544 ratings)
  • 5 stars
    79.33%
  • 4 stars
    18.13%
  • 3 stars
    2%
  • 2 stars
    0.32%
  • 1 star
    0.19%

VT

Dec 23, 2019

Filled StarFilled StarFilled StarFilled StarFilled Star

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF

May 13, 2020

Filled StarFilled StarFilled StarFilled StarFilled Star

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

From the lesson

Activity Floats

Professor Odeh introduces the types of floats in a construction project including; total float, free float, interfering float and independent float.

Taught By

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explore our Catalog

Join for free and get personalized recommendations, updates and offers.