Independent Float

Loading...
View Syllabus

Skills You'll Learn

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Reviews

4.8 (1,459 ratings)
  • 5 stars
    79.71%
  • 4 stars
    17.95%
  • 3 stars
    1.78%
  • 2 stars
    0.34%
  • 1 star
    0.20%
GV
Sep 9, 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF
May 13, 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

From the lesson
Activity Floats
Professor Odeh introduces the types of floats in a construction project including; total float, free float, interfering float and independent float.

Taught By

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explore our Catalog

Join for free and get personalized recommendations, updates and offers.