This course focuses on learning how to develop and manage a schedule. The first module provides an overview of the Construction Scheduling course. The second module introduces bar or Gantt charts and how they are used as scheduling tools. During the third module, learners will create activity precedence diagrams, also referred to as activity on node diagrams, which graphically represent the construction activities in a project and their relationships. The fourth module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram. Forward and backward pass calculations are covered in the fifth module, and during the sixth module, Professor Odeh discusses the importance of critical paths, including what it is and why it is important.



Construction Scheduling
This course is part of Construction Management Specialization

Instructor: Ibrahim Odeh, Ph.D., MBA
Access provided by UNext Manipal
62,590 already enrolled
(2,298 reviews)
Recommended experience
What you'll learn
The key project scheduling techniques and procedures
How to develop and manage a schedule and understand scheduling tools such as bar charts, activity on arrow, and activity on nodes
The multiple relationships that connect all the construction activities from start to finish
The importance of the critical path in a project network and project activities float
Skills you'll gain
Details to know

Add to your LinkedIn profile
12 assignments
See how employees at top companies are mastering in-demand skills

Build your subject-matter expertise
- Learn new concepts from industry experts
- Gain a foundational understanding of a subject or tool
- Develop job-relevant skills with hands-on projects
- Earn a shareable career certificate

There are 16 modules in this course
The first module provides an overview of the Construction Scheduling course and the topics that will be covered. Learners will discover the relationships connecting construction activities, how to perform scheduling procedures, how to determine critical path and more. Professor Odeh will describe the differences between calendar dates and work dates and teach how to deal with uncertainty in construction projects.
What's included
1 video2 readings1 plugin
The second module introduces bar or Gantt charts and how they are used as scheduling tools. Bar charts represent a project work item or activity as a time scaled bar; the length of which represents the planned duration of a construction activity.
What's included
3 videos1 assignment1 discussion prompt
In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.
What's included
3 videos1 reading
This module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram.
What's included
5 videos1 reading1 assignment1 discussion prompt
Forward and Backward Pass Calculations are covered in this module. Forward Pass Calculations determine the minimum dates at which each construction activity can be performed and, ultimately, the minimum duration of a construction project. Backward Pass Calculations compute the latest dates by which each construction activity can be performed without increasing the projects minimum duration.
What's included
4 videos1 reading1 assignment
Professor Odeh discusses the importance of critical path in this module including what it is and why it is important. Learners will identify a critical path in a project and how to determine a critical path in different relationships.
What's included
6 videos1 reading1 assignment1 discussion prompt
Professor Odeh introduces the types of floats in a construction project including; total float, free float, interfering float and independent float.
What's included
5 videos1 reading1 discussion prompt
In this module, the difference between working dates and calendar dates is explained and how to chart both in a project plan.
What's included
3 videos1 reading1 assignment
Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.
What's included
8 videos1 reading2 assignments1 discussion prompt
The Program Evaluation and Review Technique (PERT) is introduced in this module which relates to uncertainty in estimating the duration of construction activities in a project schedule. PERT helps project managers determine the probability of a project being completed in a certain number of days.
What's included
6 videos1 reading1 discussion prompt
Jennifer Buermann, of the STV Group, discusses the role of the scheduler in a construction project and how to determine if a project is on track to meet the estimated goals. Also covered are ways to adjust to ensure the project stays on track.
What's included
3 videos1 reading1 assignment
Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.
What's included
5 videos1 reading2 assignments
Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.
What's included
12 videos2 readings1 assignment1 discussion prompt
Christopher Toomey, Senior Vice President of AECOM Global Programs, discussed scheduling for large programs also known as the Integrated Master Scheduler. Mr. Toomey illustrates how to develop and maintain the Integrated Master Schedule and identifies key features.
What's included
3 videos1 reading1 discussion prompt
Dr. Eduardo Gamez, Deputy Director of Risk Management for AECOM, introduces Risk Allocation and Planning. Dr. Gamez discusses the importance of formal risk management and how to use risk assessment as a support tool for planning and scheduling.
What's included
6 videos1 reading
Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.
What's included
4 videos1 reading1 assignment1 discussion prompt1 plugin
Earn a career certificate
Add this credential to your LinkedIn profile, resume, or CV. Share it on social media and in your performance review.
Instructor

Offered by
Why people choose Coursera for their career




Learner reviews
2,298 reviews
- 5 stars
79.75%
- 4 stars
17.23%
- 3 stars
2.26%
- 2 stars
0.30%
- 1 star
0.43%
Showing 3 of 2298
Reviewed on Oct 1, 2023
Great lecture videos and course content as well as quizzes but a little bit focus is required on primavera lecture video resolution to clearly see every command and option.
Reviewed on May 13, 2020
Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.
Reviewed on Oct 17, 2019
I have learnt a lot of new Scheduling tools, very happy to complete this course. Thanks a lot Columbia University & respected mentors. Hats off & thumb up.
Explore more from Business

Columbia University

L&T EduTech

Columbia University