Learner Reviews & Feedback for Construction Scheduling by Columbia University
About the Course
Top reviews
AY
Aug 10, 2018
Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.
LF
May 13, 2020
Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.
351 - 375 of 426 Reviews for Construction Scheduling
By usman s
•Jun 15, 2020
Great course to understand the terminology of Scheduling and getting a basic sense. It is also a great course if you want to review your scheduling knowledge to understand how it works.
By Jason K
•Oct 5, 2020
i would have liked more hands on instruction with the scheduling programs. we can purchase these but if you make a mistake, no one is there to grade or help.
By Orlando J P P
•Oct 28, 2018
Overall a good course. An improvement could be a capstone component to this specific course to showcase the material learned across the full duration.
By Rogerio G V
•Sep 29, 2025
Curso muito bom , porem as traduções as vezes dificultam um pouco o entendimento. Professores trazem bom conteúdo e boa experiencia profissional.
By Vivek P
•Jun 19, 2020
I find this course very interesting and I have learn alot form this . I like the vidoes as they explained the theoretical concepts with examples
By Jatin M
•Nov 22, 2016
Very briefly covered and clearly explained, but in my opinion it needs to add more on Risk assessment and management, and baseline scheduling.
By Joseph W K
•Nov 5, 2020
Good course. Some speakers could have used better real life examples to illustrate their concepts but overall very interesting
By Gerry J
•Apr 29, 2021
There are some technical difficulties that need to be worked out when completing the pop up questions.
Great course overall.
By Akshay K
•Sep 26, 2024
This is best course for construction projects management. It enhanced the working behaviour for work portfolio. Thanks
By Patsy L
•Oct 17, 2018
Love the first part of the course as there were lots of exercises. The second part of the course is more theoretical.
By Amar M
•Oct 23, 2021
Week 5 wasn't that productive in terms of keeping me on with activities like other weeks. Overall great course!
By Tamir G
•Jan 20, 2020
From the entire coarse I learned systematic basic knowledge about "what I should know about scheduling''.
By Juan P C
•Oct 16, 2017
Great introductory course for non civil engineers or architects that want to get involved in the industry
By Donavan E
•Oct 10, 2019
I feel that the softewares used in this industry was not presented properly. the visual aids were poor
By Ram j
•May 16, 2020
Informative. I would recommend taking the course to understand the basics of construction scheduling.
By Erich S
•Jul 20, 2020
I like the calculations. The Lean guy, Sam Spata covers too much too fast during his lectures.
By Kalamba B
•Jul 3, 2020
like this course, but much deeper learning would be more welcome on certain topics. thank you
By Elodie T
•May 3, 2020
Complete courses, but pity that some of the projection like software modules are bad quality.
By Joshua W
•May 13, 2017
Very informative and helps to look at other not traditional scheduling methods.
By Wiadita D A
•May 4, 2021
The risk allocation and planning section is a bit difficult to understand.
By Diego A
•May 13, 2020
The first three weeks of the course are way too basic and slow to develop.
By Michelle W
•Mar 17, 2021
I wish it wasn't "about" scheduling, but instead actually had scheduling.
By Zhanar B
•Feb 10, 2017
I like the course for its clear structure and straightforward content.
By Detorrie T
•Apr 5, 2018
This was a fast-paced and intense course brimming with great content.
By Aleksandra A
•Dec 4, 2020
I expected to see more examples of real-life construction projects.