Learner Reviews & Feedback for Construction Scheduling by Columbia University
About the Course
Top reviews
SK
Oct 1, 2023
Great lecture videos and course content as well as quizzes but a little bit focus is required on primavera lecture video resolution to clearly see every command and option.
LF
May 13, 2020
Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.
376 - 400 of 432 Reviews for Construction Scheduling
By Zhanar B
•Feb 10, 2017
I like the course for its clear structure and straightforward content.
By Detorrie T
•Apr 5, 2018
This was a fast-paced and intense course brimming with great content.
By Aleksandra A
•Dec 4, 2020
I expected to see more examples of real-life construction projects.
By Kevin S
•Jun 7, 2020
Great intro to construction scheduling, from project flow to tech.
By Jelin S
•Jul 24, 2022
really good , there was need for better explaination of softwares
By amr e
•Oct 22, 2017
good course with a great experience as a beginner in scheduling.
By Toriano B
•Jul 9, 2023
I enjoyed the class but I really needed better interaction.
By Nnamdi A
•Oct 19, 2022
the video section in week four should be made practical
By Hanna E
•Oct 3, 2017
Good information, but some errors in one of the quizzes.
By Evangelos K
•May 13, 2021
Great refresher from college course. Highly recommend.
By Jorge J L
•May 6, 2017
Great course, very thorough, rigorous and engaging.
By José P
•Oct 10, 2020
An exciting new way of scheduling construction.
By Durgesh K S
•Oct 2, 2018
I got alot of knowledge..... about scheduling.
By Tsiripane N
•Mar 8, 2023
it was so difficult to complete this coarse
By Alfonso P
•Feb 25, 2018
Prof. Odeh is very good. Worth watching!
By Bishwajit B
•Sep 8, 2019
The Lean methods are best articulated.
By Deleted A
•Aug 18, 2019
I liked the course, it is very useful
By Darisa S R
•Aug 14, 2020
Pretty good, but very basic concepts
By justin v
•Dec 31, 2018
just take good notes and you'll pass
By Alimahmud S
•Dec 29, 2024
I don't want to do upgrade summit
By Gelli l B
•Jun 24, 2024
Deeper dive into the topic please
By Urviy S L
•May 4, 2021
Risk is hard to me understand
By ALDIN A
•Nov 6, 2023
Updated course materials
By Michael C
•Apr 13, 2026
fun and engaging class.
By Vincent T C
•Jan 9, 2019
Helpful course course!