This course focuses on learning how to develop and manage a schedule. The first module provides an overview of the Construction Scheduling course. The second module introduces bar or Gantt charts and how they are used as scheduling tools. During the third module, learners will create activity precedence diagrams, also referred to as activity on node diagrams, which graphically represent the construction activities in a project and their relationships. The fourth module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram. Forward and backward pass calculations are covered in the fifth module, and during the sixth module, Professor Odeh discusses the importance of critical paths, including what it is and why it is important.
By the end of this course, you will be able to:
-Discover key project scheduling techniques and procedures
-Learn how to develop and manage a schedule, and understand scheduling tools such as bar charts, activity on arrow, and activity on nodes
-Explore the multiple relationships that connect all the construction activities in our project from start to finish
-Learn about creating a network diagram, defining the importance of the critical path in a project network, and defining project activities float
-Understand the fundamentals of bar charts, precedence diagrams, activity on arrow, Program
-Evaluation and Review Technique (PERT), range estimating, linear project operations, and the line of balance (LOB)
Status: Construction Management
Construction Management
Status: Diagram Design
Diagram Design
Beginner·Course·25 hours
Featured reviews
4.0
·Reviewed Oct 27, 2018
Overall a good course. An improvement could be a capstone component to this specific course to showcase the material learned across the full duration.
4.0
·Reviewed Dec 26, 2016
I am really fascinated by this course and its a first step towards Project Planning and specially Lean Scheduling Its a brilliant and advance method in Construction field.
5.0
·Reviewed Mar 15, 2019
It was a very dynamic course which contained many useful knowledge. I gained many important information that will help me a lot.Thanks to Coursera and to my Instructors.
5.0
·Reviewed Apr 13, 2021
Content was very good. It would be better if you can explain things a bit briefly since some video contents under some topics are too much long and it is hard to study.
5.0
·Reviewed Jul 22, 2020
Very effective one for a civil engineer. I have known so many important things which i want to apply in my professional field in future. thanks for the course
5.0
·Reviewed Dec 26, 2016
The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.
4.0
·Reviewed Jun 14, 2020
Great course to understand the terminology of Scheduling and getting a basic sense. It is also a great course if you want to review your scheduling knowledge to understand how it works.
5.0
·Reviewed Sep 27, 2019
This course is dedicated to anyone in the construction management industry and/or the willingness to learn about construction management. I will highly recommend this course!
5.0
·Reviewed Oct 17, 2019
I have learnt a lot of new Scheduling tools, very happy to complete this course. Thanks a lot Columbia University & respected mentors. Hats off & thumb up.
5.0
·Reviewed Aug 10, 2018
Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.
5.0
·Reviewed Jun 3, 2017
Extremely well prepared, with plenty of knowledge to be gained, well planned hands-on exercises and well distributed in terms of time and assessments
5.0
·Reviewed Dec 23, 2019
This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.
All reviews
Showing: 20 of 436
All Learners
All Stars
Most Helpful
G
George
5.0
·Reviewed Sep 10, 2020
It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.
L
Leigh
5.0
·Reviewed May 14, 2020
Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.
G
Geder
5.0
·Reviewed Sep 27, 2019
This course is dedicated to anyone in the construction management industry and/or the willingness to learn about construction management. I will highly recommend this course!
V
Vladimir
2.0
·Reviewed Nov 21, 2018
It is incredible that for a paid course, the slides are not downloadable
T
Tsegaye
5.0
·Reviewed Apr 11, 2022
Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.
V
Vahid
5.0
·Reviewed Dec 24, 2019
This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.
F
Felix
5.0
·Reviewed Dec 27, 2016
The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.
D
Daniel
4.0
·Reviewed Oct 10, 2019
I thought that the course was a bit too simplistic. I would have liked more detailed examples and assignments. Also, it would have been nice to have most of the later slides to print out or copy. Some of the diagrams were a bit tedious to draw.
J
JB
3.0
·Reviewed Jun 22, 2019
Week 4 there were some obvious miscues. The quiz had two questions related to the 7th calculation for the Line of Balance. However, Mr. Odeh went from the 6th equation to the 8th, skipping the 7th entirely. I had to dig in the forums for the equation, in order to complete the weeks project and the quiz.
E
Elizabeth
5.0
·Reviewed Apr 19, 2019
I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.
J
Jude
4.0
·Reviewed Jul 31, 2017
Top of the line course. There's one really boring guy though. Not going to single him out, but it definitely isn't Ibrahim Odeh. One recommendation would be to include the lecture slides for download as down under the Construction Project Management specialization subject.
O
Oleh
4.0
·Reviewed Apr 28, 2019
Hello! Very interesting course.
Because of practically absence of hands-off materials learning will take a little more time. It will be nice if add practical part to topic about apps for scheduling, even it`ll be free app
A
Aldo
4.0
·Reviewed Apr 30, 2020
this course gave me a lot of tools and concepts to bring into my professional construction experience. Sometimes i've found some questions too generic and their answers, after a depth analysis, were not well-fitted.
M
Muhammad
4.0
·Reviewed Dec 27, 2016
I am really fascinated by this course and its a first step towards Project Planning and specially Lean Scheduling Its a brilliant and advance method in Construction field.
S
Server
3.0
·Reviewed Jun 25, 2018
informative, teaches principles, theory but not arousing interest. There is room to improve.
D
Daniel
2.0
·Reviewed Feb 6, 2022
the course is very old, the technologies, softwares and examples we are living right know are much different from what is explain on this course.
R
robin
4.0
·Reviewed Mar 27, 2020
Great course, very instructive.
However the videos showing the BIM are not high resolution enough to see what appeared on the software making it a bit hard to follow. For that part it would be better to try the steps dictated by the teacher on a trial version. The BIM part of this course should be more hands on.
The lean part of this course should be more detailed. I would have like to know more about the way to use lean in a boardroom using post it.
The risk management was very interesting. There should be an emphasis in this certification about the fact that a baseline is uncomplete without a risk analysis because the project will always have some delays. I would have like to more hands on how to do a Monte Carlo risk analysis using a simple tool for example Excel.
Thank you all!
F
Faraz
3.0
·Reviewed Nov 9, 2019
This is theory based course only which does not allow us to work on the actual software like we did in earlier course. The theory is very good to provide the knowledge but if we do not apply the concepts on the actual software to do the assignments then it is hard to understand the concept.
Hopefully in future students do have the ability to use the actual software to do the assignments.
I
IULIAN
1.0
·Reviewed Oct 3, 2024
no practical advice. just theory and generic stuff.