Columbia University

Construction Scheduling

Access provided by Mastery Marketplace

66,497 already enrolled

Gain insight into a topic and learn the fundamentals.

2,323 reviews

Beginner level

Recommended experience

Flexible schedule
2 weeks at 10 hours a week
Learn at your own pace
93%
Most learners liked this course
Gain insight into a topic and learn the fundamentals.

2,323 reviews

Beginner level

Recommended experience

Flexible schedule
2 weeks at 10 hours a week
Learn at your own pace
93%
Most learners liked this course

What you'll learn

  • The key project scheduling techniques and procedures 

  • How to develop and manage a schedule and understand scheduling tools such as bar charts, activity on arrow, and activity on nodes

  • The multiple relationships that connect all the construction activities from start to finish

  • The importance of the critical path in a project network and project activities float

Details to know

Shareable certificate

Add to your LinkedIn profile

Assessments

12 assignments

Taught in English

See how employees at top companies are mastering in-demand skills

 logos of Petrobras, TATA, Danone, Capgemini, P&G and L'Oreal

Build your subject-matter expertise

This course is part of the Construction Management Specialization
When you enroll in this course, you'll also be enrolled in this Specialization.
  • Learn new concepts from industry experts
  • Gain a foundational understanding of a subject or tool
  • Develop job-relevant skills with hands-on projects
  • Earn a shareable career certificate

There are 16 modules in this course

The first module provides an overview of the Construction Scheduling course and the topics that will be covered. Learners will discover the relationships connecting construction activities, how to perform scheduling procedures, how to determine critical path and more. Professor Odeh will describe the differences between calendar dates and work dates and teach how to deal with uncertainty in construction projects.

What's included

1 video2 readings1 plugin

The second module introduces bar or Gantt charts and how they are used as scheduling tools. Bar charts represent a project work item or activity as a time scaled bar; the length of which represents the planned duration of a construction activity.

What's included

3 videos1 assignment1 discussion prompt

In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.

What's included

3 videos1 reading

This module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram.

What's included

5 videos1 reading1 assignment1 discussion prompt

Forward and Backward Pass Calculations are covered in this module. Forward Pass Calculations determine the minimum dates at which each construction activity can be performed and, ultimately, the minimum duration of a construction project. Backward Pass Calculations compute the latest dates by which each construction activity can be performed without increasing the projects minimum duration.

What's included

4 videos1 reading1 assignment

Professor Odeh discusses the importance of critical path in this module including what it is and why it is important. Learners will identify a critical path in a project and how to determine a critical path in different relationships.

What's included

6 videos1 reading1 assignment1 discussion prompt

Professor Odeh introduces the types of floats in a construction project including; total float, free float, interfering float and independent float.

What's included

5 videos1 reading1 discussion prompt

In this module, the difference between working dates and calendar dates is explained and how to chart both in a project plan.

What's included

3 videos1 reading1 assignment

Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.

What's included

8 videos1 reading2 assignments1 discussion prompt

The Program Evaluation and Review Technique (PERT) is introduced in this module which relates to uncertainty in estimating the duration of construction activities in a project schedule. PERT helps project managers determine the probability of a project being completed in a certain number of days.

What's included

6 videos1 reading1 discussion prompt

Jennifer Buermann, of the STV Group, discusses the role of the scheduler in a construction project and how to determine if a project is on track to meet the estimated goals. Also covered are ways to adjust to ensure the project stays on track.

What's included

3 videos1 reading1 assignment

Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.

What's included

5 videos1 reading2 assignments

Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.

What's included

12 videos2 readings1 assignment1 discussion prompt

Christopher Toomey, Senior Vice President of AECOM Global Programs, discussed scheduling for large programs also known as the Integrated Master Scheduler. Mr. Toomey illustrates how to develop and maintain the Integrated Master Schedule and identifies key features.

What's included

3 videos1 reading1 discussion prompt

Dr. Eduardo Gamez, Deputy Director of Risk Management for AECOM, introduces Risk Allocation and Planning. Dr. Gamez discusses the importance of formal risk management and how to use risk assessment as a support tool for planning and scheduling.

What's included

6 videos1 reading

Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.

What's included

4 videos1 reading1 assignment1 discussion prompt1 plugin

Earn a career certificate

Add this credential to your LinkedIn profile, resume, or CV. Share it on social media and in your performance review.

Instructor

Instructor ratings
(441 ratings)
Ibrahim Odeh, Ph.D., MBA
Columbia University
5 Courses288,298 learners

Offered by

Why people choose Coursera for their career

Felipe M.

Learner since 2018
"To be able to take courses at my own pace and rhythm has been an amazing experience. I can learn whenever it fits my schedule and mood."

Jennifer J.

Learner since 2020
"I directly applied the concepts and skills I learned from my courses to an exciting new project at work."

Larry W.

Learner since 2021
"When I need courses on topics that my university doesn't offer, Coursera is one of the best places to go."

Chaitanya A.

"Learning isn't just about being better at your job: it's so much more than that. Coursera allows me to learn without limits."

Learner reviews

  • 5 stars

    79.71%

  • 4 stars

    17.26%

  • 3 stars

    2.23%

  • 2 stars

    0.30%

  • 1 star

    0.47%

Showing 3 of 2323

BA

Reviewed on Mar 15, 2019

SK

Reviewed on Oct 1, 2023

LF

Reviewed on May 13, 2020

Explore more from Business